Difference between revisions of "ArtsIntensiveSyllabus2010"

From CCRMA Wiki
Jump to: navigation, search
Line 8: Line 8:
  
 
Lecture: Physics of sound, electricity and magnetism
 
Lecture: Physics of sound, electricity and magnetism
 +
 
Lab: Microphone and Hydrophone Building (Meet in the Classroom)
 
Lab: Microphone and Hydrophone Building (Meet in the Classroom)
  
Line 14: Line 15:
  
 
Lab: Microphone Building
 
Lab: Microphone Building
 +
 
Lecture: Sound Design, Software for manipulation
 
Lecture: Sound Design, Software for manipulation
  
Line 25: Line 27:
  
 
Lecture: Recording, Mic Placement, Analyzing and Modifying Sound
 
Lecture: Recording, Mic Placement, Analyzing and Modifying Sound
 +
 
Lab: Begin large sampling project, Talk about format for posting.
 
Lab: Begin large sampling project, Talk about format for posting.
  
Line 39: Line 42:
  
 
9/7 Tuesday
 
9/7 Tuesday
 +
 
AM Lecture: Instrument Design and Acoustics, Experimental Musical Instruments
 
AM Lecture: Instrument Design and Acoustics, Experimental Musical Instruments
 +
 
Lab: Make your own experimental musical instrument
 
Lab: Make your own experimental musical instrument
  
  
 
9/8 Wednesday
 
9/8 Wednesday
 +
 
Field trip to the Exploratorium and San Francisco’s Mission District  
 
Field trip to the Exploratorium and San Francisco’s Mission District  
 
(Meet in front of Wilbur at 9am)
 
(Meet in front of Wilbur at 9am)
 +
  
 
9/9 Thursday
 
9/9 Thursday
 +
 
Lecture: Demonstration of Spatialization and the CCRMA Listening Room
 
Lecture: Demonstration of Spatialization and the CCRMA Listening Room
 +
 
Lab: Recording and Sound Design
 
Lab: Recording and Sound Design
 +
  
 
9/10 Friday
 
9/10 Friday
 +
 
Move Out Day
 
Move Out Day
 +
  
 
9/11 Saturday
 
9/11 Saturday
 +
 
Field Trip to San Jose Junkyard (pick n’ pull) and Flea Market
 
Field Trip to San Jose Junkyard (pick n’ pull) and Flea Market
 +
  
 
9/13 Monday
 
9/13 Monday
 +
 
Work on Final Projects
 
Work on Final Projects
 +
  
 
9/14 Tuesday
 
9/14 Tuesday
 +
 
Work on Final Projects.  Due at 5pm
 
Work on Final Projects.  Due at 5pm
 +
 
Tech Rehearsal in CCRMA Stage
 
Tech Rehearsal in CCRMA Stage
 +
 
 
 
9/15    Wednesday
 
9/15    Wednesday
 +
 
Help get speakers set up for final project and Transitions Concert.  Learn to tune speakers.
 
Help get speakers set up for final project and Transitions Concert.  Learn to tune speakers.
 +
 
8:30 Final Performance – please invite your friends
 
8:30 Final Performance – please invite your friends
 +
  
 
9/16 Thursday
 
9/16 Thursday
 +
 
Optional CCRMA Transitions Concert
 
Optional CCRMA Transitions Concert

Revision as of 11:48, 1 September 2010

2010 Sound Art Intensive


Final Project: The goal of this class is to learn more about sound and to play with combining that sound in artful ways. The final project for the class will be a 2 – 3 minute composition that uses sound material that you and your classmates have recorded over the course of the next two weeks.Your final project is due by Tuesday, 9/14, at 5pm. Final pieces will be performed in the CCRMA courtyard on Wednesday, 9/15, at 8:30pm.


8/31 Tuesday

Lecture: Physics of sound, electricity and magnetism

Lab: Microphone and Hydrophone Building (Meet in the Classroom)


9/1 Wednesday

Lab: Microphone Building

Lecture: Sound Design, Software for manipulation


9/2 Thursday

Fieldtrip to Monterey Bay for Whale Watching (Meet in front of Wilbur at 9am)


9/3 Friday

Lecture: Recording, Mic Placement, Analyzing and Modifying Sound

Lab: Begin large sampling project, Talk about format for posting.


9/4 Saturday

AI Fieldtrip to San Francisco


9/6 Monday

Day Off


9/7 Tuesday

AM Lecture: Instrument Design and Acoustics, Experimental Musical Instruments

Lab: Make your own experimental musical instrument


9/8 Wednesday

Field trip to the Exploratorium and San Francisco’s Mission District (Meet in front of Wilbur at 9am)


9/9 Thursday

Lecture: Demonstration of Spatialization and the CCRMA Listening Room

Lab: Recording and Sound Design


9/10 Friday

Move Out Day


9/11 Saturday

Field Trip to San Jose Junkyard (pick n’ pull) and Flea Market


9/13 Monday

Work on Final Projects


9/14 Tuesday

Work on Final Projects. Due at 5pm

Tech Rehearsal in CCRMA Stage


9/15 Wednesday

Help get speakers set up for final project and Transitions Concert. Learn to tune speakers.

8:30 Final Performance – please invite your friends


9/16 Thursday

Optional CCRMA Transitions Concert