256b-winter-2011/final

From CCRMA Wiki
Revision as of 23:05, 21 February 2011 by Ge (Talk | contribs) (Created page with '= Final Project: Social Musical Experience = Due date (checkpoint): 2010.2.7 3:15pm (class), Monday Due date (final): 2010.2.14 11:59:59pm, Monday === The goals of this assignm…')

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Final Project: Social Musical Experience

Due date (checkpoint): 2010.2.7 3:15pm (class), Monday Due date (final): 2010.2.14 11:59:59pm, Monday

The goals of this assignment

  • cloud-mediated, social musical instrument / experience
  • must have a local (client-side) interactive component (audio + interaction mandatory, graphics optional)
  • primary interaction must be enhanced by the social component (e.g., location, compass, sharing of content, multiple participants, wide-area, collaboration, discovery, scale - zooming out, "micro- and macro-cosmic")

Deliverables

  • milestone 0 (Wednesday, 2/16, in class): 30-second seed concept
  • milestone 1 (Wednesday 2/23, in class): presenting the vision, design, and milestones (3-5 minutes) - presentation + feedback
  • milestone 2 (Monday 2/28, in class): closing the loop (client | application server | data) - demo + feedback
  • milestone 3 (Monday 3/7, in class): primary interaction / functionality done (minimal essential system) - demo + feedback
  • final presentation (Thursday, 3/17, noon, CCRMA Stage): presentation! open to public

Note

  • have fun with it!!!
  • you are welcome to work together, but you must do/turn in your own work