128-spring-2013

From CCRMA Wiki
Revision as of 15:09, 31 March 2013 by Jieun5 (Talk | contribs) (Spring Concert: group check-in meetings)

Jump to: navigation, search

Assignments

All homeworks will be checked in to svn prior to class. Details TBD.


Group Check-in Meetings Sign-up

Every group (and all members of the group) should attend a check-in meeting in preparation for our two concerts.

SLOrktastic Chamber Music

Each group must sign up for one check-up meeting with the teaching staff on the week of 4/22 (wk 4).

(Sign-up slots will become available here around 4/17)


Spring Concert: group check-in meetings

Each group must sign up for one check-up meeting with the teaching staff on the week of 5/13 (wk 7) or week of 5/20 (wk 8).

(Sign-up slots will become available here around 5/8)



Slork Setup Sign-up [everyone tears down]

Everyone signs up for at least 3 setup slots. Setup starts at 6:40 PM

Week 1 (4/3)

  • Kurt
  • Spencer
  • Jieun

Week 2 (4/10)

Week 3 (4/17)

Week 4 (4/24)

Week 5 (5/1)

Week 6 (5/8)

Week 7 (5/15)

Week 8 (5/22)

Week 9 (5/29)


GEAR

SpeakerSetup.jpg

The (hypothetical) numbering system for the current SLOrk speaker arrays!