128-spring-2013

From CCRMA Wiki
Revision as of 13:58, 30 March 2013 by Jieun5 (Talk | contribs) (Created page with '== Concert Schedule == * (5/2) Slorktastic Chamber Music * (6/5) End of Quarter Final Spring Concert == Assignments == All homeworks will be checked in to svn prior to class.…')

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Concert Schedule

  • (5/2) Slorktastic Chamber Music
  • (6/5) End of Quarter Final Spring Concert

Assignments

All homeworks will be checked in to svn prior to class. Details TBD.

  • Assignment1
    write a piece using ChucK and 6-channel hemi speaker(s)
  • Assignment2
    chamber piece for Slorktastic Concert
  • Assignment3
    ensemble piece for final Spring Concert

Slork Setup Sign-ins [everyone tears down]

Everyone signs up for at least two setup slots. Setup starts at 6:30 PM

Week 2 (4/10)

Week 3 (4/17)

Week 4 (4/24)

Week 5 (5/1)

Week 6 (5/8)

Week 7 (5/15)

Week 8 (5/22)

Week 9 (5/29)

GEAR

SpeakerSetup.jpg

The (hypothetical) numbering system for the current SLOrk speaker arrays!