Difference between revisions of "128-spring-2013"
From CCRMA Wiki
(Created page with '== Concert Schedule == * (5/2) Slorktastic Chamber Music * (6/5) End of Quarter Final Spring Concert == Assignments == All homeworks will be checked in to svn prior to class.…') |
(→Slork Setup Sign-ins [everyone tears down]) |
||
Line 14: | Line 14: | ||
== Slork Setup Sign-ins [everyone tears down] == | == Slork Setup Sign-ins [everyone tears down] == | ||
− | Everyone signs up for at least | + | Everyone signs up for at least 3 setup slots. Setup starts at 6:30 PM |
==== Week 2 (4/10) ==== | ==== Week 2 (4/10) ==== |
Revision as of 12:59, 30 March 2013
Contents
Concert Schedule
- (5/2) Slorktastic Chamber Music
- (6/5) End of Quarter Final Spring Concert
Assignments
All homeworks will be checked in to svn prior to class. Details TBD.
- Assignment1
write a piece using ChucK and 6-channel hemi speaker(s) - Assignment2
chamber piece for Slorktastic Concert - Assignment3
ensemble piece for final Spring Concert
Slork Setup Sign-ins [everyone tears down]
Everyone signs up for at least 3 setup slots. Setup starts at 6:30 PM
Week 2 (4/10)
Week 3 (4/17)
Week 4 (4/24)
Week 5 (5/1)
Week 6 (5/8)
Week 7 (5/15)
Week 8 (5/22)
Week 9 (5/29)
GEAR
The (hypothetical) numbering system for the current SLOrk speaker arrays!