Difference between revisions of "128-spring-2013"
From CCRMA Wiki
(→Assignments) |
|||
Line 4: | Line 4: | ||
All homeworks will be checked in to svn prior to class. Details TBD. | All homeworks will be checked in to svn prior to class. Details TBD. | ||
− | * '''Assignment1'''<br/> | + | * '''[[Assignment1]]'''<br/> analysis of *LOrk pieces |
− | * ''' | + | * '''[[Assignment2]]'''<br/> single-hemi instrument |
− | * '''[[ | + | * '''[[Assignment3]]'''<br/> initial prototype for SLOrktastic |
+ | * '''[[Assignment4]]'''<br/> polish piece. program notes | ||
+ | * '''[[Assignment5]]'''<br/> write up: reflections of SLOrktastic | ||
+ | * '''[[Assignment6]]'''<br/> initial prototype for Spring Concert | ||
+ | * '''[[Assignment7]]'''<br/> revise prototype | ||
+ | * '''[[Assignment8]]'''<br/> polish piece | ||
+ | * '''[[Assignment9]]'''<br/> finalize piece. program notes | ||
+ | * '''[[Assignment10]]'''<br/> write up: reflections of Spring Concert | ||
<br/> | <br/> |
Revision as of 14:07, 30 March 2013
Contents
Assignments
All homeworks will be checked in to svn prior to class. Details TBD.
- Assignment1
analysis of *LOrk pieces - Assignment2
single-hemi instrument - Assignment3
initial prototype for SLOrktastic - Assignment4
polish piece. program notes - Assignment5
write up: reflections of SLOrktastic - Assignment6
initial prototype for Spring Concert - Assignment7
revise prototype - Assignment8
polish piece - Assignment9
finalize piece. program notes - Assignment10
write up: reflections of Spring Concert
Slork Setup Sign-ins [everyone tears down]
Everyone signs up for at least 3 setup slots. Setup starts at 6:30 PM
Week 2 (4/10)
Week 3 (4/17)
Week 4 (4/24)
Week 5 (5/1)
Week 6 (5/8)
Week 7 (5/15)
Week 8 (5/22)
Week 9 (5/29)
GEAR
The (hypothetical) numbering system for the current SLOrk speaker arrays!