Difference between revisions of "128-spring-2013"

From CCRMA Wiki
Jump to: navigation, search
(Equipment check-out log)
(Equipment check-out log)
Line 104: Line 104:
  
 
=== Equipment check-out log ===
 
=== Equipment check-out log ===
* Caleb, Victoria, Luke: 3 gametrak controlers (checked out 4/10)
+
* Caleb, Victoria, Luke: 3 gametrak controllers (checked out 4/10)
  
 
== Misc ==
 
== Misc ==
 
* [[128-spring-2013/ChucK_Tutorial_1 | ChucK Tutorial 1]]
 
* [[128-spring-2013/ChucK_Tutorial_1 | ChucK Tutorial 1]]

Revision as of 21:13, 10 April 2013

Assignments

All homeworks will be checked in to svn prior to class. Details TBD.


Group Check-in Meetings Sign-up

Every group (and all members of the group) should attend a check-in meeting in preparation for our two concerts.

SLOrktastic Chamber Music

Sign up for a check-up meeting with the teaching staff on the week of 4/22 (wk 4).

(Sign-up slots will become available here around 4/17)


Spring Concert: group check-in meetings

Sign up for a check-up meeting with the teaching staff on the week of 5/13 (wk 7) or week of 5/20 (wk 8).

(Sign-up slots will become available here around 5/8)



Slork Setup Sign-up [everyone tears down]

Everyone signs up for at least 2+ setup slots. Setup starts at 6:40 PM

Week 1 (4/3)
  • Kurt
  • Spencer
  • Jieun
Week 2 (4/10)
  • Justin
  • Victoria Grace
  • Jim
  • Josh
Week 3 (4/17)
  • Caleb
  • Jianfeng
  • Reza
  • Luke
  • Audrey
Week 4 (4/24)
  • George
  • Nick
  • Justin
Week 5 (5/1)
Week 6 (5/8)
Week 7 (5/15)
Week 8 (5/22)
Week 9 (5/29)


GEAR

SpeakerSetup.jpg

The (hypothetical) numbering system for the current SLOrk speaker arrays!


Equipment check-out log

  • Caleb, Victoria, Luke: 3 gametrak controllers (checked out 4/10)

Misc