128-spring-2010

From CCRMA Wiki
Revision as of 19:15, 7 April 2010 by Rob (Talk | contribs) (Slork Setup Sign-ins [everyone tears down])

Jump to: navigation, search

Concert Schedule

  • (4/29) Slorktastic Chamber Music
  • (TBD) End of Quarter Final Spring Concert

Assignments

All homeworks will be checked in to svn on Tuesday evenings. Details TBD.

  • Assignment #1
    write a piece using ChucK and 6-channel hemi speaker(s)
  • Assignment #2
    chamber piece for Slorktastic Concert
  • Assignment #3
    ensemble piece for final Spring Concert

Slork Setup Sign-ins [everyone tears down]

Everyone signs up for at least two setup slots. Setup starts at 6:30 PM

michael berger == weak 1

Week 2 (4/7)

  • Jieun
  • Easter Bunny
  • Max Mathews
  • Godzilla
  • Michael berger

Week 3 (4/14)

  • Charlie
  • Daniel S
  • Remington Microscreen
  • Stephen hess
  • Michael berger

Week 4 (4/21)

  • Akken (l =>k)
  • Lukan
  • Ben
  • Linden
  • Michael berger

Week 5 (4/28)

  • Eric
  • AAron
  • Akken
  • Issaaak
  • Michael berger

Week 6 (5/5)

  • Jay
  • Uri
  • Nik
  • jianghKarlow
  • Michael berger

Week 7 (5/12)

  • Adam0.1
  • Ben
  • Geortge
  • Lukan
  • Michael berger

Week 8 (5/19)

  • AAron
  • Erik
  • Isak
  • Linden
  • Michael berger

Week 9 (5/26)

  • Uri
  • Nick
  • Daniel
  • Micro
  • Michael berger

Week 10 (6/2)

  • Adam0.2
  • Michael berger
  • JackKarlos
  • Hess (like the truck)

GEAR

SpeakerSetup.jpg

The (hypothetical) numbering system for the current SLOrk speaker arrays!