Difference between revisions of "128-spring-2010"

From CCRMA Wiki
Jump to: navigation, search
(Concert Schedule)
m (Slork Setup Sign-ins [everyone tears down])
Line 14: Line 14:
 
== Slork Setup Sign-ins [everyone tears down] ==
 
== Slork Setup Sign-ins [everyone tears down] ==
 
Everyone signs up for at least two setup slots. Setup starts at 6:30 PM
 
Everyone signs up for at least two setup slots. Setup starts at 6:30 PM
 +
 +
michael berger == weak 1
  
 
==== Week 2 (4/7) ====
 
==== Week 2 (4/7) ====
 
* Jieun
 
* Jieun
*  
+
* Easter Bunny
*  
+
* Max Mathews
*  
+
* Godzilla
 +
* Michael berger
 
==== Week 3 (4/14)====
 
==== Week 3 (4/14)====
*  
+
* Charlie
*  
+
* Daniel S
*   
+
Remington Microscreen
*  
+
* Stephen hess
 +
* Michael berger
 
==== Week 4 (4/21)====
 
==== Week 4 (4/21)====
*  
+
* Akken (l =>k)
*  
+
* Lukan
*  
+
* Ben
*  
+
* Linden
 +
* Michael berger
 
==== Week 5 (4/28)====
 
==== Week 5 (4/28)====
*  
+
* Eric
*  
+
* AAron
*  
+
* Akken
*  
+
* Issaaak
 +
* Michael berger
 
==== Week 6 (5/5)====
 
==== Week 6 (5/5)====
*  
+
* Jay
*  
+
* Uri
*  
+
* Nik
*  
+
* jianghKarlow
 +
* Michael berger
 
==== Week 7 (5/12)====
 
==== Week 7 (5/12)====
*  
+
* Adam0.1
*  
+
* Ben
*  
+
* Geortge
*  
+
* Lukan
 +
* Michael berger
 
==== Week 8 (5/19)====
 
==== Week 8 (5/19)====
*  
+
* AAron
*  
+
* Erik
*  
+
* Isak
*  
+
* Linden
 +
* Michael berger
 
==== Week 9 (5/26)====
 
==== Week 9 (5/26)====
*
+
* Uri
*  
+
* Nick
*  
+
* Daniel
*
+
*Micro
 +
* Michael berger
 
==== Week 10 (6/2)====
 
==== Week 10 (6/2)====
*  
+
* Adam0.2
*
+
* Michael berger
*
+
*JackKarlos
*
+
*Hess (like the truck)
  
 
== GEAR ==
 
== GEAR ==

Revision as of 19:15, 7 April 2010

Concert Schedule

  • (4/29) Slorktastic Chamber Music
  • (TBD) End of Quarter Final Spring Concert

Assignments

All homeworks will be checked in to svn on Tuesday evenings. Details TBD.

  • Assignment #1
    write a piece using ChucK and 6-channel hemi speaker(s)
  • Assignment #2
    chamber piece for Slorktastic Concert
  • Assignment #3
    ensemble piece for final Spring Concert

Slork Setup Sign-ins [everyone tears down]

Everyone signs up for at least two setup slots. Setup starts at 6:30 PM

michael berger == weak 1

Week 2 (4/7)

  • Jieun
  • Easter Bunny
  • Max Mathews
  • Godzilla
  • Michael berger

Week 3 (4/14)

  • Charlie
  • Daniel S
  • Remington Microscreen
  • Stephen hess
  • Michael berger

Week 4 (4/21)

  • Akken (l =>k)
  • Lukan
  • Ben
  • Linden
  • Michael berger

Week 5 (4/28)

  • Eric
  • AAron
  • Akken
  • Issaaak
  • Michael berger

Week 6 (5/5)

  • Jay
  • Uri
  • Nik
  • jianghKarlow
  • Michael berger

Week 7 (5/12)

  • Adam0.1
  • Ben
  • Geortge
  • Lukan
  • Michael berger

Week 8 (5/19)

  • AAron
  • Erik
  • Isak
  • Linden
  • Michael berger

Week 9 (5/26)

  • Uri
  • Nick
  • Daniel
  • Micro
  • Michael berger

Week 10 (6/2)

  • Adam0.2
  • Michael berger
  • JackKarlos
  • Hess (like the truck)

GEAR

SpeakerSetup.jpg

The (hypothetical) numbering system for the current SLOrk speaker arrays!