Difference between revisions of "128-spring-2010"

From CCRMA Wiki
Jump to: navigation, search
(Slork Setup Sign-ins [everyone tears down])
(Concert Schedule)
Line 2: Line 2:
  
 
* (4/29) Slorktastic Chamber Music
 
* (4/29) Slorktastic Chamber Music
*  End of Quarter Final Spring Concert
+
* (TBD) End of Quarter Final Spring Concert
 
+
  
 
== Assignments ==
 
== Assignments ==

Revision as of 21:31, 5 April 2010

Concert Schedule

  • (4/29) Slorktastic Chamber Music
  • (TBD) End of Quarter Final Spring Concert

Assignments

All homeworks will be checked in to svn on Tuesday evenings. Details TBD.

  • Assignment #1
    write a piece using ChucK and 6-channel hemi speaker(s)
  • Assignment #2
    chamber piece for Slorktastic Concert
  • Assignment #3
    ensemble piece for final Spring Concert

Slork Setup Sign-ins [everyone tears down]

Everyone signs up for at least two setup slots. Setup starts at 6:30 PM

Week 2 (4/7)

  • Jieun

Week 3 (4/14)

Week 4 (4/21)

Week 5 (4/28)

Week 6 (5/5)

Week 7 (5/12)

Week 8 (5/19)

Week 9 (5/26)

Week 10 (6/2)

GEAR

SpeakerSetup.jpg

The (hypothetical) numbering system for the current SLOrk speaker arrays!