Difference between revisions of "128-spring-2009"

From CCRMA Wiki
Jump to: navigation, search
m
m (Assignments)
Line 13: Line 13:
  
 
* '''Assignment #1'''<br/>(Tue, 4/7) "Unplugged" Instrument
 
* '''Assignment #1'''<br/>(Tue, 4/7) "Unplugged" Instrument
* '''Assignment #2'''<br/>(Tue, 4/14) Single-hemi Instrument
+
* '''Assignment #2'''<br/>(Tue, 4/14) "Unplugged" 5-person piece
 
* '''Assignment #3'''<br/>(Tue, 4/21) Short-Single-Source-Slork-Sound-Sketch (SSSSSS)
 
* '''Assignment #3'''<br/>(Tue, 4/21) Short-Single-Source-Slork-Sound-Sketch (SSSSSS)
 
* '''Assignment #4'''<br/>(Tue, 4/21) Multiple-Instrument Sound Sketch (MISS)
 
* '''Assignment #4'''<br/>(Tue, 4/21) Multiple-Instrument Sound Sketch (MISS)
 
* '''Final Projects'''<br/> Piece to be premiered on the 6/3 Slork concert at Dink.
 
* '''Final Projects'''<br/> Piece to be premiered on the 6/3 Slork concert at Dink.
 
 
  
 
== Slork Setup Sign-ins ==
 
== Slork Setup Sign-ins ==

Revision as of 20:28, 1 April 2009

Links:

Slork-Gearlist-2009

Concert Schedule

  • (5/9) Slorktastic Chamber Music #1
  • (5/16) Slorktastic Chamber Music #2
  • (6/4) Dinkelspiel Slorkfest-of-Doom


Assignments

All homeworks will be checked in to svn on Tuesday evenings. Details TBD.

  • Assignment #1
    (Tue, 4/7) "Unplugged" Instrument
  • Assignment #2
    (Tue, 4/14) "Unplugged" 5-person piece
  • Assignment #3
    (Tue, 4/21) Short-Single-Source-Slork-Sound-Sketch (SSSSSS)
  • Assignment #4
    (Tue, 4/21) Multiple-Instrument Sound Sketch (MISS)
  • Final Projects
    Piece to be premiered on the 6/3 Slork concert at Dink.

Slork Setup Sign-ins

Everyone signs up for at least one setup slot. Setup starts at 6:30 PM

Week 2 (4/8)

Week 3 (4/15)

Week 4 (4/22)

Week 5 (4/29)

Week 6 (5/6)

Week 7 (5/13)

Week 8 (5/20)

Week 9 (5/27)

Week 10 (6/3)

  • everyone (@ DINK)


GEAR

Slork-Gearlist-2009