Difference between revisions of "128-spring-2009"

From CCRMA Wiki
Jump to: navigation, search
m (Slork Setup Sign-ins)
m
Line 4: Line 4:
 
* (6/4) Dinkelspiel Slorkfest-of-Doom
 
* (6/4) Dinkelspiel Slorkfest-of-Doom
 
   
 
   
 +
 +
== Assignments ==
 +
All homeworks will be checked in to svn on Tuesday evenings. Details TBD.
 +
 +
* Assignment #1<br/>(Tue, 4/7) "Unplugged" Instrument
 +
* Assignment #2<br/>(Tue, 4/14) Single-hemi Instrument
 +
* Assignment #3<br/>(Tue, 4/21) Short-Single-Source-Slork-Sound-Sketch (SSSSSS)
 +
* Assignment #4<br/>(Tue, 4/21) Multiple-Instrument Sound Sketch (MISS)
 +
* Final Projects<br/> Piece to be premiered on the 6/3 Slork concert at Dink.
 +
 +
 
== Slork Setup Sign-ins ==
 
== Slork Setup Sign-ins ==
 
Everyone signs up for at least one setup slot. Setup starts at 6:30 PM
 
Everyone signs up for at least one setup slot. Setup starts at 6:30 PM

Revision as of 16:19, 1 April 2009

Concert Schedule

  • (5/9) Slorktastic Chamber Music #1
  • (5/16) Slorktastic Chamber Music #2
  • (6/4) Dinkelspiel Slorkfest-of-Doom


Assignments

All homeworks will be checked in to svn on Tuesday evenings. Details TBD.

  • Assignment #1
    (Tue, 4/7) "Unplugged" Instrument
  • Assignment #2
    (Tue, 4/14) Single-hemi Instrument
  • Assignment #3
    (Tue, 4/21) Short-Single-Source-Slork-Sound-Sketch (SSSSSS)
  • Assignment #4
    (Tue, 4/21) Multiple-Instrument Sound Sketch (MISS)
  • Final Projects
    Piece to be premiered on the 6/3 Slork concert at Dink.


Slork Setup Sign-ins

Everyone signs up for at least one setup slot. Setup starts at 6:30 PM

Week 2 (4/8)

Week 3 (4/15)

Week 4 (4/22)

Week 5 (4/29)

Week 6 (5/6)

Week 7 (5/13)

Week 8 (5/20)

Week 9 (5/27)

Week 10 (6/3)

  • everyone (@ DINK)